Home Pricing How It Works Services Locations Climate Zones Title 24 Guide About Contact Order Now →
Commercial Title 24

Restaurant Title 24

Custom Quote·Free Scope Review·24-Hour Rush Available
CEC-approved compliance software · NRCC documentation · Statewide California · T24Report

Permit-ready NRCC energy compliance for California restaurants — kitchen exhaust and makeup air, HVAC, refrigeration, and water heating scoped from your plans.

Request Commercial Quote → Contact Us

Restaurants are among the most system-intensive commercial projects, combining a commercial kitchen, dining area, high ventilation loads, refrigeration, and significant service water heating. New restaurants and most restaurant tenant improvements in California require Title 24 (Part 6) energy documentation for permit.

Kitchen ventilation and mechanical scope

Commercial kitchens use exhaust hoods and matched makeup air, and the Energy Code addresses kitchen ventilation, fan power, and controls on the mechanical certificate (NRCC-MCH). Dining-area HVAC, economizers, demand-controlled ventilation, and zoning are also documented there. Because kitchen exhaust and makeup air drive both comfort and energy use, the mechanical scope is usually the most detailed part of a restaurant report.

Water heating, refrigeration, lighting

Restaurants have large service water heating loads for dishwashing and sanitation, plus refrigeration for walk-ins and prep. Regulated versus process loads must be distinguished, and process refrigeration is documented on the process systems certificate (NRCC-PRC) where applicable. Interior and exterior lighting (NRCC-LTI/LTO) and any envelope work (NRCC-ENV) round out the scope. We prepare the certificates on the path that fits your design.

Common restaurant compliance points

Restaurants frequently raise questions about exhaust-to-makeup-air balance, ventilation controls in the dining area, and how much of the kitchen ventilation is documented on the certificate versus verified in the field. Because the mechanical scope is large, coordinating the exhaust hood schedule, makeup air units, and rooftop HVAC on a single mechanical certificate keeps plan check efficient. Water-heating and refrigeration equipment schedules should be finalized before submittal so the certificates match the installed equipment and the project avoids energy corrections late in review.

What we need to quote and prepare your report

Restaurants touch many systems — send the complete plan set:

Example project

Illustrative example — not a specific customer: A former retail space is converted to a full-service restaurant with a Type I exhaust hood, matched makeup air, two rooftop units, a walk-in cooler, and a high-efficiency water heater. The project requires NRCC-MCH for kitchen ventilation and HVAC, NRCC-PRC for process refrigeration where applicable, and NRCC-LTI/LTO for lighting; kitchen ventilation and HVAC controls are then confirmed through acceptance testing.

Commercial Title 24 pricing

Commercial projects are quoted individually — priced by building type, conditioned floor area, compliance path, and the systems in scope, not a flat rate. Upload your plans for a firm quote, with standard, rush, and same-day options.

Request a commercial quote →

← Back to Commercial Title 24 · All services · Request a quote

Questions & Answers

Does kitchen exhaust affect Title 24?
Yes. Commercial kitchen ventilation — exhaust and makeup air, fan power, and controls — is addressed on the mechanical certificate and is often the largest part of a restaurant energy report.
Is refrigeration part of the report?
Process refrigeration is documented on the process systems certificate (NRCC-PRC) where applicable. Send your refrigeration equipment schedule so we scope it correctly.
Does a change of use to a restaurant require a report?
A change of use combined with mechanical, lighting, or envelope work generally requires the corresponding NRCC documentation. Confirm the exact scope with your building department.
What water-heating details do you need?
The plumbing plan and water-heating equipment schedule, since dishwashing and sanitation create large service water heating loads that affect compliance.
Do you visit the restaurant?
No — the report is prepared from your plans. Acceptance testing and installation verification happen in the field with certified professionals during construction.
How is a restaurant quoted?
By the systems in scope and building size, not a flat rate — restaurants involve more systems than most commercial projects. Upload plans for a firm quote.

Related Title 24 Topics

Browse the complete Title 24 guide →

Title 24 by City

We serve all of California — see all locations.

Why Choose T24Report for Commercial Title 24?

  • Custom Quote — Priced by Project Scope
  • Free Project Scope Review
  • NRCC Compliance for Nonresidential Buildings
  • CEC-Approved Compliance Software
  • Prescriptive & Performance Paths
  • Standard, Rush & Same-Day Options
  • Two Revisions Included
  • 100% Online — Statewide California

Ready for Your Commercial Title 24 Quote?

Upload your commercial plan set and we'll scope every regulated system and return a custom quote — standard, rush, and same-day options available.

Contact Us