Home Pricing How It Works Services Locations Climate Zones Title 24 Guide About Contact Order Now →
Commercial Title 24

Medical Office Title 24

Custom Quote·Free Scope Review·24-Hour Rush Available
CEC-approved compliance software · NRCC documentation · Statewide California · T24Report

Permit-ready NRCC energy compliance for California medical and dental offices — ventilation, HVAC, and lighting scoped from your plans.

Request Commercial Quote → Contact Us

Medical and dental offices combine exam and treatment rooms, labs, and administrative areas, often with elevated ventilation and specialized HVAC. New medical office construction and most medical tenant improvements in California require Title 24 (Part 6) energy documentation for permit.

Ventilation and HVAC scope

Clinical spaces frequently need higher ventilation rates and careful HVAC zoning, which are documented on the mechanical certificate (NRCC-MCH) along with economizers, fan power, and controls. Where treatment areas have distinct requirements, the mechanical scope must reflect them accurately. We coordinate the report with your mechanical engineer’s equipment schedules and plans.

Lighting, envelope, and process loads

Indoor lighting with the required controls is documented on NRCC-LTI, exterior lighting on NRCC-LTO, and any altered envelope on NRCC-ENV. Some medical equipment is treated as a process load rather than a regulated building system; we distinguish regulated from process loads so the certificates are correct. Compliance is prepared prescriptively or through performance modeling depending on the design.

Coordination with your design team

Because clinical ventilation and specialized HVAC are engineered by your mechanical designer, an accurate medical-office report depends on close coordination with their plans and equipment schedules. We build the NRCC certificates directly from the mechanical design so the documented ventilation, economizer, and control strategies match what is installed. Where a room use is unusual — imaging, a minor-procedure room, or a small lab — flag it early so the mechanical treatment and any process-load classification are correct before the permit set is submitted, which keeps plan check smooth.

What we need to quote and prepare your report

Send the full plan set so we scope ventilation and all regulated systems:

Example project

Illustrative example — not a specific customer: A 3,500-square-foot suite is converted into a medical office with several exam rooms, a small lab, upgraded ventilation, and new LED lighting with occupancy controls. The project needs NRCC-MCH for the HVAC and ventilation changes and NRCC-LTI for lighting and controls; installed controls and equipment are verified through acceptance testing during construction.

Commercial Title 24 pricing

Commercial projects are quoted individually — priced by building type, conditioned floor area, compliance path, and the systems in scope, not a flat rate. Upload your plans for a firm quote, with standard, rush, and same-day options.

Request a commercial quote →

← Back to Commercial Title 24 · All services · Request a quote

Questions & Answers

Do medical offices have different ventilation rules?
Clinical spaces often require higher ventilation and specific HVAC treatment, which the mechanical certificate must document. Your mechanical engineer’s plans drive the exact requirements.
Is a dental office treated like a medical office?
Both are nonresidential occupancies documented on NRCC forms, but the systems differ (for example, dental vacuum and compressed air). We scope each project from its own plans.
Does specialized medical equipment count?
Some equipment is a process load rather than a regulated building system. We distinguish regulated from process loads so the report reflects only what the code covers.
What do you need to quote a medical TI?
Architectural, mechanical with ventilation and equipment schedules, and lighting plans, plus the address and scope. That lets us prepare the correct NRCC certificates.
Do you perform inspections or site visits?
No. The report is design-stage documentation. Field acceptance testing and installation certificates are completed by certified professionals during construction.
How is a medical office quoted?
By systems in scope, ventilation complexity, and size — not a flat rate. Upload plans for a firm custom quote.

Related Title 24 Topics

Browse the complete Title 24 guide →

Title 24 by City

We serve all of California — see all locations.

Why Choose T24Report for Commercial Title 24?

  • Custom Quote — Priced by Project Scope
  • Free Project Scope Review
  • NRCC Compliance for Nonresidential Buildings
  • CEC-Approved Compliance Software
  • Prescriptive & Performance Paths
  • Standard, Rush & Same-Day Options
  • Two Revisions Included
  • 100% Online — Statewide California

Ready for Your Commercial Title 24 Quote?

Upload your commercial plan set and we'll scope every regulated system and return a custom quote — standard, rush, and same-day options available.

Contact Us