Home Pricing How It Works Services Locations Climate Zones Title 24 Guide About Contact Order Now →
Commercial Title 24

Office Tenant Improvement Title 24

Custom Quote·Free Scope Review·24-Hour Rush Available
CEC-approved compliance software · NRCC documentation · Statewide California · T24Report

Permit-ready NRCC energy compliance for California office tenant improvements — lighting, HVAC, and controls scoped from your plans.

Request Commercial Quote → Contact Us

An office tenant improvement (TI) reconfigures leased or owner-occupied space — new partitions, lighting, HVAC zoning, and finishes. Most office TIs in California must show Title 24 (Part 6) energy compliance before the building department issues a permit, with the exact scope driven by what you are altering.

When an office TI triggers Title 24

A lighting-only refresh, a full mechanical and electrical reconfiguration, and a change of use are treated differently under the Energy Code. Alterations to the indoor lighting system, HVAC equipment or distribution, the building envelope, or the addition of conditioned area each pull in their own NRCC certificate. A cosmetic-only remodel with no regulated systems may fall outside the energy scope — but that determination should be documented, not assumed.

Systems typically in scope

Office TIs most often involve indoor lighting (NRCC-LTI) with occupancy sensors, daylighting controls, and multi-level controls; HVAC changes (NRCC-MCH) covering zoning, economizers, and controls; and sometimes envelope work (NRCC-ENV) if walls, roofs, or glazing are altered. Outdoor and parking lighting (NRCC-LTO) — and sign lighting (NRCC-LTS) — apply when those exterior fixtures change. We identify which certificates your project needs and prepare them on the prescriptive or performance path.

Documents and plan-check

Common office TI energy corrections include lighting controls that are drawn but not fully specified, a fixture schedule that does not match the reflected ceiling plan, and HVAC changes that are missing from the mechanical certificate. A complete, coordinated plan set up front — architectural, lighting with a controls narrative, and mechanical schedules — lets us prepare accurate NRCC certificates and reduces the chance of a plan-check cycle. If energy corrections do come back, send the correction list and the relevant sheets and we resolve the flagged items so the permit can move forward.

What we need to quote and prepare your report

Send the full plan set so we can scope every regulated system accurately:

Example project

Illustrative example — not a specific customer: A 6,000-square-foot suite is re-partitioned with new LED lighting, added occupancy and daylighting controls, and two reconfigured rooftop units. Because lighting and HVAC are both altered, the project needs NRCC-LTI and NRCC-MCH documentation; the lighting controls and any changed HVAC equipment are then confirmed in the field through acceptance testing.

Commercial Title 24 pricing

Commercial projects are quoted individually — priced by building type, conditioned floor area, compliance path, and the systems in scope, not a flat rate. Upload your plans for a firm quote, with standard, rush, and same-day options.

Request a commercial quote →

← Back to Commercial Title 24 · All services · Request a quote

Questions & Answers

Does a lighting-only office remodel need Title 24?
Altering the indoor lighting system generally requires an indoor lighting certificate (NRCC-LTI) even when nothing else changes. A like-for-like lamp swap may not; confirm the exact scope with your building department.
What is the difference between a report and acceptance testing?
Our report is the design-stage NRCC documentation submitted for permit. Acceptance testing (NRCA) is a separate field step performed during construction by a certified technician to verify installed controls and equipment operate correctly.
Prescriptive or performance path — which do you use?
It depends on the project. The prescriptive path meets each component requirement directly; the performance path uses whole-building energy modeling and adds flexibility when a design does not meet a prescriptive item. We recommend the path that fits your plans.
How fast can you turn it around?
Turnaround depends on scope and how complete the plan set is. Standard, rush, and same-day options are available — request a quote with your plans for a firm timeline.
Do you need to visit the office?
No. The energy report is prepared from your plans. Any required field verification is handled separately during construction by the appropriate certified professional.
Can you help if plan check returns energy corrections?
Yes. Send the correction list and the relevant plan sheets and we address the flagged NRCC items. Confirm any jurisdiction-specific requirement with your local building department.

Related Title 24 Topics

Browse the complete Title 24 guide →

Title 24 by City

We serve all of California — see all locations.

Why Choose T24Report for Commercial Title 24?

  • Custom Quote — Priced by Project Scope
  • Free Project Scope Review
  • NRCC Compliance for Nonresidential Buildings
  • CEC-Approved Compliance Software
  • Prescriptive & Performance Paths
  • Standard, Rush & Same-Day Options
  • Two Revisions Included
  • 100% Online — Statewide California

Ready for Your Commercial Title 24 Quote?

Upload your commercial plan set and we'll scope every regulated system and return a custom quote — standard, rush, and same-day options available.

Contact Us