Home Pricing How It Works Services Locations Climate Zones Title 24 Guide About Contact Order Now →
Commercial Title 24

Commercial HVAC Title 24

Custom Quote·Free Scope Review·24-Hour Rush Available
CEC-approved compliance software · NRCC documentation · Statewide California · T24Report

Permit-ready NRCC-MCH mechanical compliance for California commercial HVAC — equipment, economizers, controls, and ventilation scoped from your plans.

Request Commercial Quote → Contact Us

Commercial HVAC is documented on the mechanical certificate (NRCC-MCH) and is one of the most technical parts of a nonresidential Title 24 report. New systems, replacements, and alterations to equipment, distribution, or controls can all trigger mechanical compliance under California’s Energy Code.

What the mechanical certificate covers

NRCC-MCH addresses equipment efficiency, economizers, fan power, ventilation, demand-controlled ventilation, duct sealing and insulation, and required controls. The scope depends on system type — packaged rooftop units, split systems, VRF, chilled water, or dedicated outdoor air systems each have their own considerations. We prepare the certificate from your mechanical plans and equipment schedules, on the prescriptive or performance path.

Acceptance testing and field steps

Many mechanical measures require acceptance testing (NRCA-MCH) — for example, economizer operation, demand-controlled ventilation, and certain controls — performed in the field during construction by a certified Acceptance Test Technician. Our report is the design-stage documentation; the acceptance tests confirm the installed system performs as designed. We identify which tests your scope is likely to trigger so nothing is missed at inspection.

Replacement vs new-system scope

Whether you are replacing existing equipment or installing a new system changes the mechanical scope. Equipment replacements focus on efficiency, controls, and the acceptance tests triggered by the new units, while new systems add full ventilation, economizer, and distribution documentation. Alterations to ductwork or controls can pull in requirements independently of the equipment itself. We scope the mechanical certificate to the actual work so the documentation — and the acceptance tests scheduled at inspection — match the installed system rather than over- or under-documenting the project.

What we need to quote and prepare your report

Send the mechanical documentation so we scope the system accurately:

Example project

Illustrative example — not a specific customer: A commercial suite replaces two aging rooftop units with high-efficiency units that include economizers and demand-controlled ventilation. The project is documented on NRCC-MCH, and the economizer and DCV functions are verified in the field through acceptance testing before final inspection.

Commercial Title 24 pricing

Commercial projects are quoted individually — priced by building type, conditioned floor area, compliance path, and the systems in scope, not a flat rate. Upload your plans for a firm quote, with standard, rush, and same-day options.

Request a commercial quote →

← Back to Commercial Title 24 · All services · Request a quote

Questions & Answers

Does replacing a rooftop unit trigger Title 24?
Replacing HVAC equipment commonly triggers mechanical documentation, and certain measures require acceptance testing. The exact scope depends on the equipment and jurisdiction — confirm locally.
What is acceptance testing for HVAC?
A field verification (NRCA-MCH) by a certified technician confirming measures such as economizer operation and demand-controlled ventilation work correctly. It is separate from our design-stage report.
Do you perform the acceptance tests?
Our deliverable is the NRCC-MCH documentation. Acceptance testing is performed in the field by a certified Acceptance Test Technician during construction.
Prescriptive or performance for HVAC?
Either can apply. We use the path that fits the design; performance modeling adds flexibility when a prescriptive item is not met.
What do you need to start?
Mechanical plans, equipment schedules, and the controls narrative, plus the address and scope. That lets us prepare NRCC-MCH accurately.
How is commercial HVAC compliance priced?
By system complexity, number of units, and controls in scope — not a flat rate. Upload plans for a firm quote.

Related Title 24 Topics

Browse the complete Title 24 guide →

Title 24 by City

We serve all of California — see all locations.

Why Choose T24Report for Commercial Title 24?

  • Custom Quote — Priced by Project Scope
  • Free Project Scope Review
  • NRCC Compliance for Nonresidential Buildings
  • CEC-Approved Compliance Software
  • Prescriptive & Performance Paths
  • Standard, Rush & Same-Day Options
  • Two Revisions Included
  • 100% Online — Statewide California

Ready for Your Commercial Title 24 Quote?

Upload your commercial plan set and we'll scope every regulated system and return a custom quote — standard, rush, and same-day options available.

Contact Us